Sprint Capacity in Story Points for Azure DevOps

Help

Sprint Capacity in Story Points is an Azure DevOps extension for planning each sprint in story points. It adds a Points capacity tab to every team's sprint, a Points capacity option in the sprint backlog's side pane, and a Points capacity hub under Boards. It works with Azure DevOps Services organizations. Walkthrough video: YouTube (70 s).

Install

  1. An Azure DevOps organization admin opens Sprint Capacity in Story Points on the Visual Studio Marketplace and selects Get, then picks the organization. It starts with a free trial.
  2. Everyone in the organization gets the tab, the side pane option and the hub. There is nothing to set up: each team starts with its process's points field and its backlog types.

Plan a sprint

  1. Go to Boards → Sprints, pick a team and a sprint, and choose the Points capacity tab (after Capacity and Analytics).
  2. Each person on the team has a row: their points in the last sprints, their days off, their capacity, the points assigned to them in this sprint, what is done, and a bar.
  3. Check the filled-in capacity and type over any number you know better. Clear a number to leave that person out.
  4. Select Save. The plan is kept for the team and that sprint, with who saved it and when.

The bar is blue while a person has room and turns red as soon as their assigned points pass their capacity; the text beside it says how many points are left or over. Click the Assigned number to see that person's items in the sprint, and their load on other teams for the same dates. Capacity stays editable while the sprint runs; a finished sprint shows done against capacity.

The Team total row adds up everyone's capacity and every point in the sprint, unassigned items included, so it stays right even when one story is shared and the split per person isn't.

How capacity is filled in

Days off

Days off come from the team's native Capacity tab: each person's days off and the team's days off, counted on the team's working days. The extension reads them and never writes to the Capacity tab. When a person has different days off on another team for the same dates, the tab and the hub show both. To ignore days off, turn off Use days off from the Capacity tab in Settings.

Items without points

An item with an empty points field counts as 0 (an item estimated at 0 counts as estimated). So nobody looks under capacity while holding unestimated work, the extension says N without points under the person, under Unassigned, in the summary line, in the person's item list (the item shows No points), in the side pane and in the hub. If no item in the sprint has the points field, the tab says so and offers Settings.

Who can change capacity

Members and admins of the team can change its capacity and settings; everyone else sees the tab read-only. If someone else saved the same sprint while you were editing, the tab says so and keeps your numbers on screen: select Reload to see theirs, then type yours again.

Side pane beside the backlog

On a sprint's Backlog, open View options and choose Points capacity under Side pane. It shows the sprint's points against the team's capacity, each person's points against theirs, and items without points. It refreshes every 30 seconds while it is open. Plan capacity opens the tab.

Points capacity hub

Under Boards → Points capacity:

The hub reads up to 60 teams (and 30 projects) at a time, teams that saved capacity first, and says when it left some out.

Settings per team

The gear button on the tab opens the team's settings:

Where the numbers live

Saved capacity and settings are kept in Azure DevOps' extension data storage inside your organization. The extension checks team membership before saving, but that storage belongs to the organization: a member with the skills could also change it outside the app. No capacity numbers, team names or work item content reach our backend. What the extension reads and stores.

Troubleshooting