Help
Sprint Capacity in Story Points is an Azure DevOps extension for planning each sprint in story points. It adds a Points capacity tab to every team's sprint, a Points capacity option in the sprint backlog's side pane, and a Points capacity hub under Boards. It works with Azure DevOps Services organizations. Walkthrough video: YouTube (70 s).
Install
- An Azure DevOps organization admin opens Sprint Capacity in Story Points on the Visual Studio Marketplace and selects Get, then picks the organization. It starts with a free trial.
- Everyone in the organization gets the tab, the side pane option and the hub. There is nothing to set up: each team starts with its process's points field and its backlog types.
Plan a sprint
- Go to Boards → Sprints, pick a team and a sprint, and choose the Points capacity tab (after Capacity and Analytics).
- Each person on the team has a row: their points in the last sprints, their days off, their capacity, the points assigned to them in this sprint, what is done, and a bar.
- Check the filled-in capacity and type over any number you know better. Clear a number to leave that person out.
- Select Save. The plan is kept for the team and that sprint, with who saved it and when.
The bar is blue while a person has room and turns red as soon as their assigned points pass their capacity; the text beside it says how many points are left or over. Click the Assigned number to see that person's items in the sprint, and their load on other teams for the same dates. Capacity stays editable while the sprint runs; a finished sprint shows done against capacity.
The Team total row adds up everyone's capacity and every point in the sprint, unassigned items included, so it stays right even when one story is shared and the split per person isn't.
How capacity is filled in
- For each person: the points they finished on this team in the last finished sprints (3 by default; 1 to 6 in Settings). Items count when they are in a completed state of their type.
- Each past sprint is first scaled up to full availability, so a past vacation doesn't lower the fill-in. A sprint where they had less than a fifth of the days is left out.
- The average is then scaled for the share of working days they have in this sprint, after the team's days off and their own, and rounded to whole points.
- A person with no finished sprints on the team gets no fill-in: type their number.
- The fill-in shows only until the team saves. After that, the saved numbers are what you see.
Days off
Days off come from the team's native Capacity tab: each person's days off and the team's days off, counted on the team's working days. The extension reads them and never writes to the Capacity tab. When a person has different days off on another team for the same dates, the tab and the hub show both. To ignore days off, turn off Use days off from the Capacity tab in Settings.
Items without points
An item with an empty points field counts as 0 (an item estimated at 0 counts as estimated). So nobody looks under capacity while holding unestimated work, the extension says N without points under the person, under Unassigned, in the summary line, in the person's item list (the item shows No points), in the side pane and in the hub. If no item in the sprint has the points field, the tab says so and offers Settings.
Who can change capacity
Members and admins of the team can change its capacity and settings; everyone else sees the tab read-only. If someone else saved the same sprint while you were editing, the tab says so and keeps your numbers on screen: select Reload to see theirs, then type yours again.
Side pane beside the backlog
On a sprint's Backlog, open View options and choose Points capacity under Side pane. It shows the sprint's points against the team's capacity, each person's points against theirs, and items without points. It refreshes every 30 seconds while it is open. Plan capacity opens the tab.
Points capacity hub
Under Boards → Points capacity:
- Across teams: one row per person, a column per team, for This sprint or Next sprint, with a total for people on several teams and their days off per team. Pick a project or All projects. A team that hasn't saved capacity for that sprint shows assigned points only.
- Overbooked: everyone over capacity this sprint and next, with the team and sprint it happens on and a link to that sprint.
The hub reads up to 60 teams (and 30 projects) at a time, teams that saved capacity first, and says when it left some out.
Settings per team
The gear button on the tab opens the team's settings:
- Points field: Story Points, Effort, Size or any custom number field of the process.
- Work item types that count: by default the team's requirement types and bugs.
- Fill in capacity from: the last sprint, or the average of the last 2 to 6.
- Use days off from the Capacity tab.
Where the numbers live
Saved capacity and settings are kept in Azure DevOps' extension data storage inside your organization. The extension checks team membership before saving, but that storage belongs to the organization: a member with the skills could also change it outside the app. No capacity numbers, team names or work item content reach our backend. What the extension reads and stores.
Troubleshooting
- The tab says the sprint has no dates. Set its start and end dates in Project settings → Team configuration → Iterations.
- A team doesn't show in the hub. Teams without sprints have nothing to show; the hub also skips teams with no saved capacity and no assigned points.
- Numbers look wrong. Check Settings: the points field and the types that count. Work items in the sprint are matched by the team's area paths.
- Anything else: contact support. We reply by email.