Microsoft Planner has no Excel or CSV import, so the usual “export Jira to CSV” advice leaves you with a file and nowhere to put it. Moving a Jira project to Planner means either rebuilding tasks row by row (by hand or with Power Automate), or using a connector that reads Jira and creates the Planner tasks in one pass. Either way, decide up front what Jira data has no Planner home, because that part doesn’t survive the trip.

The question keeps coming up on the Atlassian Community: teams asking how to move “JIRA Data / Project / Board to Microsoft Planner” (Atlassian Community), and how to “get data from Jira to MS Planner and vice versa” (Atlassian Community). The usual reason is a team that never needed Jira’s depth, such as marketing, ops or a project office, and already has Planner inside Microsoft 365.

Can you import a Jira export into Planner?

No, not natively. Planner exports a plan to Excel, but there’s no import in the other direction. Microsoft’s answer on its own Q&A forum is blunt: “you cannot import directly into the planner from Excel” — the suggested workaround is a Power Automate flow (Microsoft Q&A, 2023).

So the manual route has three steps:

  1. Export from Jira. Run a JQL search over the project and export it to CSV. Jira Cloud’s standard CSV export caps at 1,000 issues; the newer asynchronous export from the issue navigator goes up to 10,000 work items (Atlassian Support).
  2. Reshape the sheet. Cut it down to columns Planner can hold (title, description, bucket, assignee, dates, priority) and turn the Excel range into a table so a flow can read it.
  3. Build a flow. In Power Automate, loop over the table and create one Planner task per row, then update each task’s details (description, checklist) in a second action, because task creation and task details are separate calls.

It’s workable for one small project. It’s also a one-off build: every column you want carried over is another step in the flow, and assignees only resolve if you map Jira users to Microsoft 365 accounts yourself.

The Jira → Planner field crosswalk

Decide this table before you move anything:

JiraPlannerNote
SummaryTask titleClean 1:1.
DescriptionNotes / descriptionCarries over; rich formatting gets thinner.
StatusProgress (Not started / In progress / Completed) or bucketThree progress states fit a simple workflow. For a board with more columns, map each status to its own bucket.
AssigneeAssigned toOnly if the person has a Microsoft 365 account in the tenant. Planner allows up to 20 assignees per task (Microsoft Learn).
PriorityPriority (Urgent / Important / Medium / Low)Every Jira priority has to land in one of Planner’s four bands.
LabelsLabelsPlanner has a fixed set of 25 labels per plan, so pick the labels that matter.
Start / due dateStart / due date1:1.
Epic → story → sub-task(flat tasks)Basic Planner tasks have no parent-child link. Sub-tasks become ordinary tasks; checklist items (max 20 per task) can stand in for small sub-tasks.
Story points, components, fix versions, sprints, custom fields(no field)Planner has no custom fields. Put what matters in the description or a label, or let it go.
Comments(not carried)Keep them in Jira as the archive.
Attachments(not carried)Re-attach the files you still need; Planner allows 15 references per task (Microsoft Learn).

The ones that bite are hierarchy, custom fields and history. A Jira project usually encodes its structure in epics and its sizing in story points; Planner has a place for neither. If the team really does need epics as the top level, the better move may be mirroring only the epics in Planner and leaving the detail where it is.

Will the project fit in one plan?

Check the size before you start. A basic Planner plan holds up to 9,000 tasks, of which 3,000 can be active (not completed), and up to 200 buckets (Microsoft Learn, updated 2025). A long-running Jira project with years of closed issues can blow through that. The usual fix is to move only open work (status != Done) and leave the closed history in Jira, or to split the project across several plans by epic or component.

The one-time import alternative

The Microsoft Planner to Jira Connector runs in both directions. Its one-time import/export has a Jira → Planner direction: pick the Jira project, narrow it with a JQL filter, pick the target Planner plan, map the fields, and it creates one Planner task per issue in a single run (sync types).

What it maps, per its field-mapping docs:

  • Summary and description by default, plus start and due dates.
  • Status to Planner progress, or each Jira status to one or more buckets.
  • Priority into Planner’s four bands, and labels that exist in the plan.
  • Assignees matched by full name or by an explicit user map, or written into the description.
  • Numeric progress from a Jira number field (0–100), if you track one.
  • Cross-links: the Jira issue URL is added to each Planner task, so the archive is one click away.

It shares Planner’s limits from the crosswalk above: issues arrive as flat tasks (sub-tasks become ordinary tasks), and comments, attachments and custom fields like story points stay in Jira.

If part of the team keeps working in Jira after the move, a one-time import starts drifting the next day. Switch to an automated Jira → Planner sync instead, or read what a real two-way sync has to solve first. Going the other way? The sibling guide covers migrating Microsoft Planner to Jira. And if the move is about non-technical teams rather than cost, keeping both tools in sync is often the smaller change.